Abbreviations and symbols

Survey control report content

SymbolMeaning
Installed ​Installed
Connected ​Connected
Levelled 1 ​Levelled ( < 3rd Order )
Levelled 2 ​Levelled ( >= 3rd Order )
Connected Levelled 1 ​Connected, Levelled ( < 3rd Order )
Connected Levelled 2 ​Connected, Levelled ( >= 3rd Order )
Coordinated 1 ​Coordinated ( < 1st Order )
Coordinated 2 ​Coordinated ( >= 1st Order )
Connected Coordinated 1 ​Connected, Coordinated ( < 1st Order )
Connected Coordinated 2 ​Connected, Coordinated ( >= 1st Order )
Levelled Coordinated 1 ​Levelled ( < 3rd Order) , Coordinated ( < 1st Order )
Levelled Coordinated 2 ​Levelled ( >= 3rd Order) , Coordinated ( < 1st Order )
Levelled Coordinated 3 ​Levelled ( < 3rd Order) , Coordinated ( >= 1st Order )
Levelled Coordinated 4 ​Levelled ( >= 3rd Order) , Coordinated ( >= 1st Order )
Connected Levelled Coordinated 1 ​Connected, Levelled (<3rd Order ), Coordinated ( < 1st Order )
Connected Levelled Coordinated 2 ​Connected, Levelled (>=3rd Order ), Coordinated ( < 1st Order )
Connected Levelled Coordinated 3 ​Connected, Levelled (<3rd Order ), Coordinated ( >=1st Order )
Connected Levelled Coordinated 4 ​Connected, Levelled (>=3rd Order ), Coordinated ( >=1st Order )
Destroyed mark ​Destroyed Mark (D)

In this guide:

  1. Database names
  2. Tenure
  3. Features
  4. Valuations
  5. Lease tenure reference
  6. Survey control
  7. Survey control report content
  8. Historical descriptions
  9. Government land register
  10. Aerial photography

Print entire guide